Vista Engineering Doubles Solar Capacity with New 50kW Installation

22 January, 2025

At Vista Engineering, we are excited to announce the expansion of our solar energy capacity. In 2018, we took a significant step towards sustainability by installing a 50kW solar power system. Today, we are proud to share that we have doubled our solar capacity with an additional 50kW installation.

 

This expansion is a testament to our commitment to renewable energy and reducing our carbon footprint. The new installation will not only enhance our energy efficiency but also contribute to a greener future.

We are grateful for the support of the Decarbonisation Grant through High Peak Borough Council, which has been instrumental in helping us achieve this milestone. Their support has enabled us to seamlessly integrate the new solar panels with our existing system, significantly reducing our reliance on non-renewable energy sources and lowering our operational costs.

We appreciate the support of our partners and clients who share our commitment to sustainability. Together, we can make meaningful contributions to the environment and work toward a greener future.

Stay tuned for updates on our sustainability efforts and the progress we’re making toward a more sustainable tomorrow.

Contact us for prompt and friendly assistance! Call us at 01663 736 700, email sales@vistaeng.co.uk, or use our live chat. We’re here to help.

Successfully added {{filename}} to your quote list